2 • installing the hanger bracket – Hunter Fan Type 7 Models User Manual

Page 5

Advertising
background image

5

45032-01 • 11/05/08 • Hunter Fan Company

2-1. Drill two pilot holes into the wood support structure through the

outermost holes in the outlet box. The pilot holes should be 9/64”

in diameter.

Note: Your fan comes with four pre-installed neoprene noise

isolators.

2-2. Thread the lead wires from the outlet box down through the hole

in the middle of the hanger bracket.

2-3. Align the slotted holes in the hanger bracket with the pilot holes

you drilled in the wood support structure. For proper alignment

use slotted holes directly across from each other. If you are

installing the fan on an ANGLED ceiling, be sure to orient the

hanger bracket as shown in Illustration 2-3 (left or right view).

Note: The isolators should be flush against the ceiling.
2-4. Place a flat washer on each of the two 3” screws and pass the

screws through the slotted holes in the hanger bracket into the

pilot holes you drilled.

Tighten the screws into the 9/64” pilot holes; do not use lubricants

on the screws. Do not over tighten.

Flat Washer

3” Screw

Steps 2-2 – 2-4

Hanger

Bracket

Isolator

Step 2-3 (Angled Ceiling Only)

OR

Ceiling Peak

Ceiling Peak

Large

Opening

Large

Opening

LEFT

RIGHT

2 • Installing the Hanger Bracket

Advertising