Assembly, Install the handle tube and locking pin – Harbor Freight Tools 94280 User Manual

Page 9

Advertising
background image

Page 9

SKU 94280

For technical questions, please call 1-800-444-3353.

ASSEMBLY

Note: For additional information regarding the parts listed in the following pages, refer to

the

Assembly Diagram at the end of the manual.

CAUTION! Always make sure the Floor Machine is disconnected from its electrical
outlet prior to assembling the tool, changing accessories, or performing service to
the product.

Wear ANSI-approved safety impact eye goggles and non-slip foot-

wear when using the Floor Machine. Using personal safety devices
reduce the risk for injury.

Install the Handle Tube And Locking Pin

Turn the Chassis (1) upside-down and gently press the tab on the Screw Box (10)
from underneath using a screwdriver, see lower left. Remove the Screw Box.

Tab

Handle

Screw

(11)

storage

hole

transport

hole

Align the mounting holes in the lower portion of the Handle Tube (21) with the front
two mounting holes in the bracket at the rear of the Floor Machine’s Chassis (1).
This is the location that the Handle Screw is shown to the top left. Then secure the
Handle Tube to the Chassis, using one Handle Screw (11), two Flat Washers (12),
and one Hex Lock Nut (13). Replace the Screw Box (10).

For storage,

raise the Handle Tube (21) to its highest point. Then, insert the Locking

Pin (16) through the storage hole shown above.

For transport,

raise the Handle Tube (21) to its highest point. Then, insert the Lock-

ing Pin (16) through the transport hole shown above.

1.

2.

1.

2.

3.

4.

REV 07e

Advertising