Handle installation – HONDA EB5000X User Manual

Page 63

Advertising
background image

61

Handle Installation

TORQUE:

RIGHT HANDLE
BRACKET

LEFT HANDLE BRACKET

8

16 mm FLANGE BOLT (4)

LEFT UPPER HANDLE ASSY

RIGHT UPPER HANDLE ASSY

Install the right and left handles on the generator upper frame using
the brackets and 6 flange bolts.

17

22 lbf·ft (24

29 N·m , 2.4

3.0 kgf·m)

07/11/08 17:44:07 31Z22600_062

Advertising