Hoshizaki CUBELET ICEMAKER/DISPENSER DCM-750BAH-OS User Manual

Page 13

Advertising
background image

3

Legend:

BC

- bin control

Comp

- compressor

DC -

drain cycle

DT -

drain timer

DV

- drain valve

FMS

- self-contained fan motor

FT

- fill timer (low water safety)

GM

- gear motor

GMPR -

gear motor protect relay

HCR -

heater control relay

HTR

- extruding head heater

LF/S

- lower float switch

UF/S

- upper float switch

WCR

- water control relay

WV

- inlet water valve

Components Energized when the Control Switch is in the "DRAIN" Position

The "DRAIN" position on the control switch is used when cleaning and sanitizing the unit. This allows

cleaner and sanitizer to drain from the reservoir and evaporator assembly. When switching to the "DRAIN"

position during the freeze cycle, the drain valve does not energize until the

50 second shutdown sequence

terminates (

. Shutdown & Restart).

Note: To bypass the

50 second shutdown sequence, move the power switch to the "OFF" position, place the

control switch in the "DRAIN" position, then move the power switch back to the "ON" position.

UF/S

open

LF/S

open (WV on)

WCR

off

FT

started (90 sec.)

WV

on

Comp

continues

FMS

co

ntinues

GM

continues

GMPR

continues

HCR

continues

HTR

continues

DCM-750BAH(-OS), DCM-750BWH(-OS) Sequence Flow Chart and Component

Operation

1. Startup

2. Ice Purge Cycle

WV

on

LF/S

closed

UF/S

closed (WV off)

WCR

on

WV

off

GM

on

GMPR

on

HCR

on

HTR

on

Comp

on

FMS

on

WCR

continues

GM

continues

GMPR

continues

HCR

continues

HTR

continues

Power switch "ON"

Control switch in "ICE"

1. Fill Cycle

3. Freeze Cycle

Refill

(90 seconds)

LF/S

closed

UF/S

closed (WV off)

WCR

on

FT

off (90 sec.)

WV

off

Comp

continues

FMS

continues

GM

continues

GMPR

continues

HCR

continues

HTR

continues

Low Water Safety

UF/S

open

FT

exceeded

Comp

continues

FMS

continues

GM

continues

GMPR

continues

HCR

continues

HTR

continues

WV

continues

Comp

off

FMS

off

WV

continues

GM

continues

GMPR

continues

HCR

continues

HTR

continues

GM

off

GMPR

off

HCR

off

HTR

off

WV

continues until

UF/S

closes

90 seconds

60 seconds

If refill > 90 sec.

FT

, 

50 second

shutdown sequence begins

60 seconds

150 sec. Shutdown Sequence

UF/S

open

60 seconds

2. Shutdown & Restart

90 seconds

1.

Bin Full

Comp

off

FMS

off

GM

continues

GMPR

continues

HCR

continues

HTR

continues

GM

off

GMPR

off

HCR

off

HTR

off

DV

on (

DC

only)

3. Icemaker is Off

BC

open or

DC

starts

Comp

continues

FMS

continues

GM

continues

GMPR

continues

HCR

continues

HTR

continues

2. Ice Purge Cycle

4. Ice Level Lowered

See "1. Fill Cycle" above

150 seconds

BC

closed

or

20 Min. DT

off (

DC

only)

DV

off (

DC

only)

12 hour DT

reset (

DC

only)

4. 12 Hour Drain Cycle

DV

opens for

0 minutes every



hours

See "3.



Hour Drain Cycle" below.

3. 12 Hour Drain Cycle

Shutdown & Restart

1.

Drain Cycle initiates

2. Ice Purge Cycle

3. Drain Cycle

4. 12 hour DC - Restart

See "1. Fill Cycle" above

DV on for 20 minutes

Advertising