Removal and replacement of auger, Removal and replacement of evaporator – Hoshizaki CUBELET ICEMAKER/DISPENSER DCM-750BAH-OS User Manual

Page 52

Advertising
background image

5

8) Replace spout A, spout B, and the front cover of the storage bin in their correct

positions.

9) Move the power switch to the "ON" position, then replace the panels in their correct

positions.

0) Turn on the power supply, then move the control switch to the "ICE" position to start the

automatic icemaking process.

3. Removal and Replacement of Auger

) Move the control switch to the "DRAIN" position and drain all of the water from the

evaporator.

) After the water has stopped draining, move the control switch to the "OFF" position,

then turn off the power supply. Remove the front and top panels, then move the power
switch to the "OFF" position.

3) Remove the front cover of the storage bin. Remove spout B, then remove spout A.

See Fig. .

4) Remove the apron panel, then remove the left side panel.
5) Remove the extruding head heater, then remove the allen head cap screws securing

the extruding head. Using the cutter, lift out the auger assembly.

6) Remove the cutter, extruding head, and upper part of the mechanical seal from the

auger and place them on the new auger.

7) Install the new auger assembly with the upper part of the mechanical seal attached and

tighten down the allen head cap screws.

8) Replace the extruding head heater in its correct position.
9) Replace spout A, spout B, and the front cover of the storage bin in their correct

positions.

0) Move the power switch to the "ON" position, then replace the panels in their correct

positions.

) Turn on the power supply, then move the control switch to the "ICE" position to start the

automatic icemaking process.

4. Removal and Replacement of Evaporator

IMPORTANT

Always install a new drier every time the sealed refrigeration system is opened.
Do not replace the drier until after all other repair or replacement has been
made.

) Move the control switch to the "DRAIN" position and drain all of the water from the

evaporator.

) After the water has stopped draining, move the control switch to the "OFF" position,

then turn off the power supply. Remove the front and top panels, then move the power
switch to the "OFF" position.

Advertising