Assembly instruction using instruction, The operation method – haier QBJ1-270A58E User Manual

Page 13

Advertising
background image

10

Assembly Instruction Using Instruction

7.If the controller you choose has automatic water supply function,

electromagnetic valve must be fixed in room horizontally; the direction of

arrowhead labled on valve is the direction of water running out. Suggest fixing

manual water supply side line, ensure that users can use water heater normally

when the electromagnetic valve is damaged.

8.If the supply cord is damaged, in order to avoid danger, it must be replaced by

factory or maintenance department or professional staff.

9.Other requirements refer to controller introduction.

The operation method

1.K1 valve is open before using water, K2, K3 valves are closed

2.The controller is set in the status of automatical water supply, the

electromagnetic valve won't close until arriving at the set water level, and water

supply is over

3.Open K2 when you want to use the water, open K3 to adjust the temperature if it

is too high.

4.Close K2 and K3 when finish using the water.

Air supply pipe

Controller

Back
valve

Solenoid
valve

Sensor

Over flow pipe

Electric heating pipe

Tap water

Advertising
This manual is related to the following products: