Important – Huffy 21168202 User Manual

Page 23

Advertising
background image

10/04

P/N 21168202

23

Fill pole with concrete approximately 1” (2.54 cm)
below bottom elevator hole as shown.

IMPORTANT!:

WAIT A MINIMUM OF 24 HOURS BEFORE GOING ON TO NEXT STEP.

CONCRETE MUST CURE.

1

8.

IMPORTANT!:

FAILURE TO FILL YOUR
POLE COMPLETELY WITH
CONCRETE AS
DESCRIBED IN THESE
INSTRUCTIONS WILL
VOID ALL WARRANTIES
WRITTEN AND IMPLIED.

IMPORTANT!:

Make sure that
concrete does not
bulge from the end of
pole assembly. Allow
concrete to completely
cure.

50

Heavy-Duty Tape

(Not Included)

Seal hole at the bottom of the bottom pole
with heavy-duty tape (not included) to retain
rebar and concrete inside.

7.

Advertising