Installtion – haier HDY-D70-F User Manual

Page 3

Advertising
background image

4

5

Dimensions

a = 855 mm

b = 620 mm

c = 595 mm

Weight = 43 kg

Packing accessories

Checklist of the accessories and materials provided with the machine:

Quantity

To ensure the dryer operates normally, attention must be paid to the
following instructions;

The dryer must be level when installed. Its bottom is equipped with

adjustable feet. Adjust these 4 feets to level the unit before operation;

Check whether there is any damage to the dryer during transportation.

Any damaged dryer must not be used. if the unit is damaged, contact
your dryer supplier;

The dryer must be kept away from flammable substances;

The surrounding environment must be dry and ventilated;

To allow the dryer to perform better, the ambient temperature shall not be

lower than 10

nor higher than 35

℃.

Change the door-opening direction

If the direction of the dryer's door is not suitable to the location, its opening direction
may be changed. The procedure is as follows:
1. Unscrew the 4 hinge screws holding the door onto the machine and remove
the door.
2. Unscrew the door catch 6 and prise out the catch cover on the opposite side
of the door and transpose them.
3. Unscrew the door hinges and prise out the hinge covers on the opposite side
of the door and transpose them.
4. Remove the 4 blanking plugs from the screw holes on the machine and insert
them in the holes on the other side.
5. Refit the door on the opposite side of the machine.

a-door hinge b-catch cover c-door
d-hinge cover e-door catch f-blanking plug

Name

Owner's

manual

Certificate of

Conformity

Drainpipe

Installtion

Installtion

b

c

c

d e

b

a

e

f

Advertising