Installing the Switch

Installation Procedures

1. Prepare the Installation Site

Cabling Infrastructure

- Ensure the cabling infrastructure meets the

necessary network specifications. See appendix A,

“Cabling and

Technology Information Specifications”

for more information:

Installation Location

- Before installing the switch, plan its location and

orientation relative to other devices and equipment:

In the front of the switch, leave at least 7.6 cm (3 inches) of space for
the twisted-pair and fiber-optic cabling.

In the back of the switch, leave at least 3.8 cm (1 1/2 inches) of space
for the power cord.

On the sides of the switch, leave at least 7.6 cm (3 inches) for cooling.