ELECTRICAL INSTALLATION

1. Enter junction box with properly sized feeder leads. Single-phase installations require two

(2) leads; three phase installations require three (3) leads.

2. Connect these power leads to wires enclosed in junction box with wire nuts.

3. All other electrical connections are made at the factory; therefore, no other electrical

connections are necessary.


FINAL CHECKS

1. Check all connections for tightness.

2. Ensure that all the above steps are completed

3. After the water is heated for the first time, monitor the water temperature as described in

Section III, Quarterly Inspection.