Appendix c. vendor information, Appendix c.1. mcquay, Appendix c.2. trane – FieldServer FS-8700-16 User Manual

Page 26: Appendix c.3. liebert, Appendix c.4. automated logic corporation, Appendix c.5. honeywell ebi

Advertising
background image

FS-8700-16 BACnet PTP Serial Driver Manual

Page 26 of 32

FieldServer Technologies 1991 Tarob Court Milpitas, California 95035 USA Web: www.fieldserver.com

Tel: (408) 262-2299 Fax: (408) 262-9042 Toll Free: (888) 509-1970 email: [email protected]

Appendix C. Vendor Information

Appendix C.1. McQuay

McQuay Units are shipped with a default Device instance of the last 6 digits of the McQuay Serial number.

Appendix C.2. Trane

When new points are added to the FieldServer it is important to restart the Summit Workstation or BCU, otherwise
these new points may not be seen by the FieldServer.

Disconnect the FieldServer from the BACnet network when transferring images to the BCU.

Connection to a Trane BCU requires the purchase of a RTS to DB9M convertor. This is available form FST (Part #
FS-8917-02)

Appendix C.3. Liebert

Polling BACnet addresses that are not configured for Liebert systems may cause the connection to fail in older
versions of Liebert. Please contact your Liebert supplier for more information.

Appendix C.4. Automated Logic Corporation.

When an ALC module is powered up, and it does not detect valid BACnet/MSTP traffic on its MSTP port, then the
module goes into a terminal mode and MSTP communications will not be intitiated.

When connecting the FieldServer to an ALC BACnet/MSTP module, always start the FieldServer first. Wait until the
RUN Led is flashing on the FieldServer before powering up the MSTP module.

Appendix C.5. Honeywell EBI

Honeywell EBI cannot process EventNotifications with ACK_Required set to 1. The ACK_Required property of
Notification Class Map Descriptors configured for use with EBI must therefore be set to 0.

Advertising