Ch270 installation check sheet - continued – Furuno SEARCHLIGHT CH270 User Manual

Page 4

Advertising
background image

CH270 Installation Check Sheet - continued

CH181 or CH184 Hull Unit Check List

Check and note actual input voltage:
Are all cables and connections tight and strapped?

❏

Yes

❏

No

Is the unit grounded properly?

❏

Yes

❏

No

Has the soundome been lowered and raised by hand?

❏

Yes

❏

No

Have the shaft guides been adjusted for 0.5mm tolerance?

❏

Yes

❏

No

Does the shaft have a heading mark inscribed?

❏

Yes

❏

No

Is the soundome 1/2" up, in the sonar tube when retracted?

❏

Yes

❏

No

Has epoxy been used on shaft threads?

❏

Yes

❏

No

Has soundome packing sponge been removed?

❏

Yes

❏

No

Was oil added to the soundome?

❏

Yes

❏

No

**CAUTION - Do not lay soundome on its side once oil has been added**

Are all the soundome Phillips Head screws tight?

❏

Yes

❏

No

Have 3 layers of greased cotton packing been used?

❏

Yes

❏

No

Is the safety clamp installed and tightened?

❏

Yes

❏

No

Accessories Check List - if applicable

Checked operation of the SC-05WR external speaker?

❏

Yes

❏

No

Checked operation of the CH256 handheld remote control?

❏

Yes

❏

No

Sea Trial Check List

Date:

Location:

Operator:
Sea conditions:
Maximum detection range for the sea-bottom:
Maximum detection range for fish targets:
Has the sonar picture been checked for alignment?

❏

Yes

❏

No

Has the auto-retraction feature been checked?

❏

Yes

❏

No

Have the system manuals been given to the operator?

❏

Yes

❏

No

Was any hoist movement noted at maximum speed?

❏

Yes

❏

No

Operator Training

Date:

Location:

Trainer:
Training provided for:

Necessary Follow-up

Required for:
When:

Warranty Card Completed and Sent to Furuno USA

Date:

Page 2

Advertising