5 power supply unit, Mounting considerations, Mounting procedure – Furuno FAR-2157-D User Manual

Page 24

Advertising
background image

1-16

1.5 Power Supply Unit

Mounting considerations

The power supply unit may be mounted on a bulkhead or a deck. Because it has no operation
requirements it can be located almost anywhere, provided the location is well ventilated.

Mounting procedure

Fix the unit to the mounting location with four 6×20 self-tapping screws (local supply). For
mounting on a bulkhead, do the following:

1. Mark location for mounting holes.

2. Screw in the self-tapping screws at the location for the bottom fixing holes, leaving a gap of

about 5 mm between the bottom of the screw head and bulkhead.

3. Set the unit to the screws inserted at step 1.

4. Fasten the self-tapping screws at the top of the unit.

5. Tighten all self-tapping screws.

Mounting dimensions for power supply unit

240±1

420

±1

2-

φ

7

FIXING

HOLE

TERMINAL

GND
TERMINAL

#: MAINTENANCE SPACE

WINDOW
LED

440

#50

(11)

R3.5

7

240±1

TERMINAL

9

Advertising
This manual is related to the following products: