Operation – Frymaster Heated Pass Through none User Manual

Page 3

Advertising
background image

HEATED PASS THROUGH

INSTALLATION, OPERATION, SERVICE, AND PARTS

2

Power Requirements:

Voltage – 208 VAC

Frequency - 60 Hz

Single Phase

20 amp Service

4.

Operation

1. Plug the unit into the power source. *
2. Press the ON/OFF rocker switch to the ON

position.

3. Place product in the HPT in accordance with the

restaurant’s established procedures.

THIS APPLIANCE IS EQUIPPED WITH

A GROUNDING PLUG FOR YOUR

PROTECTION AGAINST SHOCK

HAZARD AND MUST BE PLUGGED

INTO A PROPERLY GROUNDED

RECEPTACLE. DO NOT CUT OR

REMOVE THE GROUNDING

PRONG.FROM THIS PLUG.

Air Tower

ON/OFF
Switch

Cowl

Plate

Power Cord

Heated air flows

from the air tower

across the plate

and into the cowl.

Blower

Plate

Air flow through the HPT

Advertising