Friedrich KM18 User Manual

Page 16

Advertising
background image

16

920-198-01

STEP 4

CHECKING WIRING AND PLUMBING: Check all wiring and
plumbing inside and outside of the wall to be sure none will be
broken where the hole is to be cut.

STEP 5

HOLE CONSTRUCTION: Depending upon size of unit to be
installed, lay out the hole dimensions per the chart below. Cut
and frame in hole to

¿nished dimensions. Use 2" x 4" material for

framing and follow the suggested typical installations in Figure
C, D, or E.

NOTE: IF THE WALL CONSTRUCTION IS TYPICAL FRAME
OR 2 x 4 STUDDING WITH BRICK OR STONE VENEERS,
LOCATE THE HOLE NEXT TO ONE OF THE STUDS. FOR
MASONRY, CONCRETE OR CINDER BLOCK WALLS,
LOCATE HOLE FOR CONVENIENCE.

NOTE: THESE DIMENSIONS ARE FOR FINISHED HOLE SIZE.

FINISHED

DIMENSION

SMALL

CHASSIS

MEDIUM

CHASSIS

LARGE

CHASSIS

A

16

3

»

16

"

18

3

»

16

"

20

3

»

8

"

B

26

3

»

16

"

26

3

»

16

"

28

1

»

4

"

CABINET

CAULK ALL SIDES

ELECTRICAL

RECEPTACLE

(SEE FIG. E FOR

LOCATION NOTE)

SHIM THE VOID
SPACE AT THE
TOP AND SIDES
WITH WOOD AS
REQUIRED

Figure C

FRAME WALL CONSTRUCTION

CAULK ALL SIDES

CABINET

SHIM VOID SPACES AT TOP AND

SIDES WITH WOOD AS REQUIRED

ELECTRICAL RECEPTACLE
(SEE FIGURE E FOR
LOCATION NOTE)

Figure D

BRICK VENEER CONSTRUCTION

MORTAR

ELECTRICAL
RECEPTACLE

POINT "X"

CABINET

CAULK

ALL SIDES

Figure E

SOLID MASONRY CONSTRUCTION

NOTE: ELECTRICAL RECEPTACLE LOCATION FROM
POINT "X" MUST BE WITHIN A MAXIMUM RADIUS OF
69" FOR 115V UNITS AND 45" FOR 230V UNITS.

Advertising