Gianni Industries Shear Lock P-MU-GS705N-30 User Manual

Specifications, Connecting diagram caution, Dimensions

Advertising
background image

Copyright

Gianni Industries, Inc. All Rights Reserved.

P-MU-GS705N-30 Ver. E Publish:2011.12.16

©

2-1

GS705N-30 Shear Lock Installation Instruction

Specifications

Connecting Diagram

Caution:

Make sure that the "+" and "-"
wires are connected correctly.
Failure to observe polarity will
result in a short circuit and is
n o t c o v e r e d b y p r o d u c t
warranty.

Dimensions


Unit: mm

3

0

3

0

3

2

6

25

1

26

7

Push-off button

Armature vertical
adjustment screws

Lock Bolt

Keep Hole

Keep Hole

Magnet Assembly

Armature Assembly

GS705N-30

Lock Bolt

+

-

Power

supply

Magnet bond sensor output
SPDT rated:
0.5A/125VAC, 1A/24VDC

+

-

N.O.

COM.

N.C.

P

o

w

e

r

In

p

u

t

M

a

g

n

e

t

b

o

n

d

s

e

n

s

o

r

o

u

tp

u

t

Vo l t a g e S e l e c t i o n j u m p e r s
Check jumper settings before
connecting the lock to 24 VDC
input power. Damage to the
lock may result from incorrect
jumper settings.

12Vdc

24Vdc

Holding Force

Power Input

Door Gap

Operating Temper.

Current Draw

Monitoring Output

Finish

Up to 1200 lbs (545 Kg) in shear.

12/24 VDC selectable via jumpers +10%
over voltage is acceptable , under voltage
will reduce holding force.

420mA/12 VDC; 210mA/24 VDC The unit
does not require initial voltage increase to
operate.

M a g n e t a n d A r m a t u r e : Z i n c p l a t e d
Housing: Black powder coated

SPDT rating

0.5A/125VAC, 1A/24VDC

2mm

-30°C to +50°C

Magnet bond sensor output,

Make sure that the door and frame is wide and deep enough to install the shear lock and run the wires. Make sure the central lines
on the door frame and door leaf align. Install the magnet assembly in the door frame before installing the armature assembly in the
door leaf.
Before installation, make sure the door, especially double-action doors, always return to the dead center after it is opened. Use
door hinges if necessary.

Control Device
N.C. contact or Access Relay

Install the magnet assembly into the door
frame before installation the armature assembly
into the door leaf. The magnet assembly requires
space to run wires, as wall as space for the
recesses portion of the unit. Make sure that the
position selected for the magnet assembly leaves
enough room on the door to install the armature
assembly.

3.5

5. 9

Advertising
Table of contents