Checking installation & cooktop operation, Pre-test checklist, Operation checklist – GE 36 ELECTRIC RADIANT COOKTOP ZEU36R User Manual

Page 8: Monogram

Advertising
background image

Pre-Test
Checklist

• Remove all protective film if present, and any stickers.

• Check to be sure that all wiring is secure and not pinched or in contact with moving parts.

• Check level of appliance.

• Check that the cooktop is properly grounded.

31-10544

229C

4053P528

(09/02 JR)

Checking the Installation & Cooktop Operation

Electronic Radiant Cooktop

Operation
Checklist

• Remove all items from the top of the cooktop surface.

• Turn on the power to the cooktop. (Refer to your Owner’s Manual.) Verify that all surface units

operate properly.

• Check that the circuit breaker is not tripped nor the house fuse blown.

• Check that conduit is securely connected to the junction box.

• See Owner’s Manual for troubleshooting list.

NOTE TO ELECTRICIAN:
The power leads supplied with this appliance are UL recognized for connections to larger gauge
household wiring. The insulation of these leads is rated at temperatures much higher than the
temperature rating of household wiring. The current carrying capacity of a conductor is governed
by the wire gauge and also the temperature rating of the insulation around the wire.

NOTE:

While performing installations

described in this book, safety glasses or goggles
should be worn.

To obtain specific information concerning any
Monogram product or service, call GE Answer
Center

®

consumer information service at

800.626.2000—any time, day or night or visit our
website at: Monogram.com.

For Monogram local service in your area, call
1.800.444.1845.

NOTE:

Product improvement is a continuing

endeavor at General Electric. Therefore,
materials, appearance and specifications are
subject to change without notice.

Monogram

®

General Electric Company
Louisville, KY 40225

Advertising