3.5 InstallatIon checklIst

locatIon and support

❑

Generator is properly located.

❑

Generator is properly supported.

❑

Generator is properly restrained.

generator coMpartMent

❑

Compartment construction is proper.

❑

Holes/Openings are vapor-sealed.

❑

Compartment size is correct.

❑

Compartment is vapor-sealed.

❑

Sound insulation is correct.

❑

Floor cutouts are properly completed.

coolIng and ventIlatIng aIr

❑

Airflow is adequate.

❑

Air inlet opening is correct.

❑

Compensate for restrictions.

❑

Check that installation has been tested.

lp gas Fuel systeM

❑

Fuel system is properly installed and checked

for leaks.

❑

Pressure at regulator inlet is correct.

❑

Rated flow of primary regulator is correct.

❑

All parts are properly installed.

❑

Fuel system is properly tested/adjusted.

exhaust systeM

❑

Exhaust system complies with all applicable

codes.

❑

Exhaust system is properly and safely installed.

electrIcal connectIons

❑

Connections comply with local code requirements

and all National Electrical Codes.

❑

Junction box is properly installed.

❑

Wiring meets all standards.

❑

All connections are correct.

❑

Conduit is properly installed and sealed.

❑

Generator is properly bonded to the vehicle.

battery InstallatIon

❑

Recommended battery is installed.

❑

Recommended cables are installed.

❑

Cables are clean and tight.

❑

Cables are connected properly.

❑

Proper ventilation is provided.

❑

Terminals are coated with anti-corrosion grease,

and terminal covers are positioned.

optIonal accessorIes

❑

Check that remote start/stop panels (if used) are

installed properly.

❑

Check that hourmeter kit (if used) is installed

properly.

❑

Check that any other options and accessories (if

used) are installed properly.

post InstallatIon tests

❑

Check that all tests are completed properly.

date oF InstallatIon

____________________________________________________

naMe oF Installer

_______________________________________________________

sIgnature oF Installer

_________________________________________________

section 3 – post-Installation start-up adjustments