Installation instructions, Before you begin, Tools needed – GE PTD915 User Manual

Page 10: Custom panel kits, Product dimensions, Installation of the warming drawer

Advertising
background image

10

Before You Begin

IMPORTANT: Save these instructions for the
local electrical inspector’s use.

IMPORTANT: OBSERVE ALL GOVERNING CODES
AND ORDINANCES.

NOTE TO INSTALLER: Leave these instructions
with the appliance after installation is completed.

NOTE TO CONSUMER: Keep this Owner’s
Manual and Installation Instructions for
future use.

NOTE: This appliance must be properly
grounded.

NOTE: Insure that the power cord does not
contact the hot surfaces on the bottom of
ovens, cooktops, or any other appliance.

Tools Needed

■

2 x4 or 2 x 2 lumber for runners and brace

■

Wood screws and adhesive or other hardware
for installing runners or shelf to support
warmer drawer.

Runners must be level, rigidly mounted and capable of
supporting 150 pounds.

■

Saw

■

Level

■

Drill and 1/16

″ bit

■

Phillips screwdriver

Custom Panel Kits

ZXD27B—This kit provides for the installation
of a custom front panel on 27

″ wide models.

ZXD30B—This kit provides for the installation
of a custom front panel on 30

″ wide models.

Product Dimensions

27

″

23

1

⁄

4

″

9

″

1

″

A

10

1

⁄

2

″

26

1

⁄

4

″

Including handle

Dimension A

27

″ Drawer

30

″ Drawer

26

3

⁄

4

″

30

″

Consumer Support

Tr

oubleshooting T

ips

Installation Instructions

Care and Cleaning

Operating Instructions

Safety Instructions

Installation of the warming drawer.

Read these instructions completely and carefully.

Advertising
This manual is related to the following products: