Mounting to shop floor notice, Notice – Grizzly 50/65 Ton Ironworker G0646 User Manual

Page 19

Advertising
background image

G0646/G0647 50/65 Ton Ironworker

-17-

Although not required, we recommend that you
mount your new machine to the floor. Because
this is an optional step and floor materials may
vary, floor mounting hardware is not included.
Generally, you can either bolt your machine to
the floor or mount it on machine mounts. Both
options are described below. Whichever option
you choose, it is necessary to level your machine
with a precision level.

Bolting to Concrete Floors

Lag shield anchors with lag bolts (

Figure 13) and

anchor studs are two popular methods for anchor-
ing an object to a concrete floor. We suggest
you research the many options and methods for
mounting your machine and choose the best that
fits your specific application.

Mounting to Shop

Floor

NOTICE

Anchor studs are stronger and more per-

manent alternatives to lag shield anchors;

however, they will stick out of the floor,

which may cause a tripping hazard if you

decide to move your machine.

Figure 14. Machine mount example.

Using Machine Mounts

Using machine mounts, shown in

Figure 14, gives

the advantage of fast leveling and vibration reduc-
tion. The large size of the foot pads distributes
the weight of the machine to reduce strain on the
floor.

NOTICE

We strongly recommend securing your

machine to the floor if it is hardwired to the

power source. Consult with your electrician

to ensure compliance with local codes.

Figure 13. Typical fasteners for mounting to

concrete floors.

Anchor Stud

Lag Shield

& Bolt