Second heater installation – GSI Outdoors VLC User Manual

Page 14

Advertising
background image

14

Deluxe Vane Axial Heater

Figure 4: The HF-7318 control board.

For Units Using

HF-7318 Control Board

2 Deluxe heaters may be connected to one grain
drying system and wired so they cycle together.
One of the heaters should have a thermostat
connected to it as per the installation instructions.
That heater will be referred to as the master. The
other heater (without the thermostat) will be
referred to as the slave.

Installation For

Standard Units

1. Install relay base (TD-100283) in master

heater control box.

2. Connect wire between term 6 on circuit board

and terminals 14 on relay base in master
heater.

3. Connect wire between term 13 on relay base

and terminals 8 on circuit board in master
heater.

4. Run 2 wires (18 gage) between master and

slave heaters.

5. Connect wires to terminal 5 and 9 (points A

and B) on relay base in master heater.

6. Connect wire from terminal 9 in master to

terminal 14 (point F) in slave unit.

7. Connect wire from terminal 5 in master to

terminal 15 (point E) in slave unit.

8. Install relay (TD-100282) in relay base.

Additional Steps For

Hi-Lo Units

1. Run 2 wires (18 gage) between master and slave

unit.

2. Connect wires to terminals 21 and 22 (points C

and D) on circuit board in main heater.

3. Connect wire from terminal 21 in master to

terminal 12 (point H) in slave unit.

4. Connect wire from terminal 22 in master to

terminal 13 (point G) in slave unit.

5. Install relay (TD-100282) in relay base.

SECOND HEATER INSTALLATION

Advertising
This manual is related to the following products:

VHC