ETL EDP70 User Manual
Page 50
 
page
50 --
MI00/10056 rev. 8 —05/2006
 
If at any time the inverter is blocked then the power history heading appears: 
POWER HISTORY
DOWN TO ACCESS
The power history page is described in detail in section 10.6.
The machine measurement signals are accessed from the main page heading as follows:
UPS xx kVA
SYSTEM NORMAL
press once
RECTIFIER
Vdc xxx V Idc xxx A
Displays the output voltage and current supplied by the 
rectifier. 
press once
BATTERY
Vb xxx V Ib xxx A
Displays the battery voltage and the charge or 
discharge current of the battery (ve = charge, - ve = 
discharge) 
press once
INVERTER F xx.x Hz
A xxx V B xxx V C xxx V
Displays the frequency and phase-neutral voltage at 
which the inverter is running. 
press once
INVERTER F xx.x Hz
AB xxx V BC xxx V CA xxx V
Displays the frequency and phase-phase voltage at 
which the inverter is running. 
press once
RESERVE F xx.x Hz
A xxx V B xxx V C xxx V
Displays the frequency and the phase-neutral voltage 
of the reserve supply. 
press once
RESERVE F xx.x Hz
AB xxx V BC xxx V CA xxx V
Displays the frequency and the phase-phase voltage of 
the reserve supply.