Installation instructions, Installation checklist – GE GEH50DNSRSA User Manual

Page 18

Advertising
background image

18

Installation Instructions

INSTALLATION CHECKLIST

1. Tank location:

– Is room size less than 10' x 10' x 7' (700 cu. ft.)? If yes, louvered door or similar ventilation is needed.
– Back of unit away from wall by 7 inches.
Front of unit is free and clear.
– Is the water heater level? If no, add shims under the base of the unit.

2. Plumbing connections:

– Does not prevent air filter removal.
– No leaks after filling the tank with water, either when water is flowing or not.

3. Condensate lines are in place:

1) Short tube on upper drain nozzle.
2) Longer tube on lower drain nozzle and directed into a floor drain or a condensate pump.

4. Temperature and pressure-relief valve is working and drain line completed per local code.

5. Electrical connection does not prevent air filter removal.

6. Verify control panel displays 120°F Hybrid mode.

7. Front cover is in place.

Advertising