Testing the thermostat – GE RAK148P1 User Manual

Page 12

Advertising
background image

Testing the thermostat.

Heat Test
1. Slide Function switch to Heat

position. Heat mode screen is
displayed.

2. Adjust set temperature so it is

5 degrees above room temperature.

3. Heat should come on within a few seconds.
4. Adjust the set temperature so it is 2 degrees below the room

temperature and the heat should turn off. Note: There is a 3
minute time delay and a 3 minute minimum run time for the
compressor when it turns on/off. (On some models, the fan
may also have a 3 minute minimum run time/off time delay).

Note: “Quick Heat Recovery” is activated each time the thermostat
is switched from Off or Cool modes to Heat mode. Electric heaters
are energized until the thermostat set point is reached. Heat pump
operation will resume at next call for heat (heat pump only).

Fan Test
1. Slide Fan Auto/On switch to On position.
2. Indoor fan turns on.
3. Slide Fan Auto/On switch to Auto position.
4. Indoor fan turns off.

AM

HEAT

12

Advertising
This manual is related to the following products: