Diagram for vertical venting, Diagrams for sidewall venting (cont’d) – Munchkin 399M User Manual

Page 16

Advertising
background image

16

**IMPORTANT NOTE: All vent pipes must be glued, properly supported and the exhaust must be pitched a
minimum of a ¼" per foot back to the heater (to allow drainage of condensate).

Figure 4-3a: 4" Roof Vent with Tee (Intake) & Coupling (Exhaust)

DIAGRAM FOR VERTICAL VENTING

VENTING

**IMPORTANT NOTE: All vent pipes must be glued, properly supported and the exhaust must be pitched a
minimum of a ¼" per foot back to the heater (to allow drainage of condensate).

Figure 4-2a: 4" Sidewall Vent with V2000 kit

DIAGRAMS FOR SIDEWALL VENTING (cont’d)

Advertising