Initial start-up – Moyer Diebel MH-60M3 User Manual

Page 18

Advertising
background image

INITIAL START-UP

16

Install the Scrap Screens
and Drain-Overflow Assembly

Install scrap screens.
Make sure rubber stopper
is secure on the drain-
overflow assembly.

Make sure the drain-overflow
seats securely in the
tank bottom.

MAKE SURE DOORS
ARE FULLY CLOSED.

INITIAL START-UP

The controls are located
on the front of the dishwasher.
A- On/Off power switch
B- Power indicator Light
C- In-cycle light
D- Extended wash switch
E- Wash water

temperature gauge

F- Final rinse

pressure gauge

Complete the installation

After plumbing and electrical connections are made, follow
the steps below to complete the installation of your dishwasher.

1. Remove the white protective covering from the

exterior of the machine.

2. Remove any foreign material from inside

the machine.

3. Make sure dishwasher power switch is off.

4. Turn main water supply on.

5. Turn main power on at the main power

service disconnect switch.

1

2

WASH

EXTENDED WASH

CYCLE

POWER

OFF

RINSE PRESSURE

C

F

D

A

B

E

Advertising
This manual is related to the following products: