Operation, 1 start-up – MGE UPS Systems 3000 User Manual
Page 16
Advertising

Page 16 -
3400723100/AD
1
2
%
%
3. Operation
3.1 Start-up
15
16
17
Press the ON / OFF button 15 .
The buzzer beeps and all the LEDs come ON.
The buzzer beeps twice during the self-test, then button 15 remains
ON, indicating that the receptacles are supplied with power.
- AC power is present: Only button 15 is ON. The protected equip-
ment is supplied by the AC-power source.
- AC power is absent: Button 15 and LED 16 are ON. The protected
equipment is supplied by the UPS, operating on battery power.
All the connected equipment is supplied with power.
1
2
%
%
Advertising
This manual is related to the following products: