INSTALL THE DUCTWORK

PREPARE THE INSTALLATION LOCATION - CONT.

WARNING

WHEN CUTTING OR DRILLING INTO WALL OR CABINET,

BE CAREFUL NOT TO CUT EXISTING ELECTRICAL

WIRING.

FIG. 6

FIG. 8

FIG. 7

3. Use 1-1/4" bit to drill opening for electric wiring.

4. Cut out duct opening in wall or cabinet with saber saw or keyhole

saw.

5. Center hood in installation opening and trace keyhole slots onto

wood filler strips on cabinet bottom.

6. Screw four #10 x 7/8 wood screws into exact center of narrow

end of traced keyhole slots. Allow 3/8" of screws to project, so

that hood can be fitted into place later.

(This section for UXT2030AA, UXT2036AA, UXT3030AA, and

UXT3036AA hoods ony. UXT4030AA and UXT4036AA hoods

skip this section and go on to "Install Range Hood".)

NOTE

These instructions will follow plans made on Page 2. Start

at the exterior and run ductwork back to the range hood.
For best possible performance, use the shortest possible
duct run and a minimum number of elbows. Do not vent a

range hood into an attice space. A buildup of grease in the

attic could become a fire hazard.
Use only metal ductwork. DO NOT USE PLASTIC DUCT.

Assemble duct run securely so that in case of a grease
fire on the range, the fire will be contained inside metal

ductwork.
Tape all duct connections.

2. Follow appropriate directions below for type of duct run you

install.

a.) Wall Cap Discharge; (FIG. 7) Use saber saw or keyhole

saw to to cut hole slightly larger than duct size used so that

duct will line up easily with damper/duct connector on hood.

Install casing strips if cap will be installed on siding. Attach

required amount of duct to wall cap and run duct back to

hood. Fasten cap to wall and caulk well.

b.) Roof Cap Discharge: (FIG. 8) Cut a hole in roof slightly

larger than duct size being used. Run ductwork down to

hood location. Leave 3/4" of duct projecting above roof

surface on high side.

Trim duct parallel to roof pitch and seal all around duct

with roof cement.

Carefully trim shingles and slide back of roof sheet under

shingles. Nail roof sheet to roof under shingles at top

two comers and two sides. Nail sheet directly to roof in

four places at bottom.

Using roof cement, seal all nail heads and shingles which

were cut or lifted. Do not seal bottom edge of roof sheet.