A. Connection

WARNING

Some procedures in this section may require conver-

sions, readjustments, or service on the oven's gas system.

Before performing these procedures, check that the main

gas supply valve and the circuit breaker/fused disconnect

are in the OFF ("O") position. After completing these proce-

dures, perform a gas leak test before operating the oven.
CAUTION

The terms of the oven's warranty require all start-ups, conver-

sions and service work to be performed by a Middleby Marshall

Authorized Service Agent. The installation, start-up and changes

required when changing from one gas type to another can be

performed ONLY by a certified professional.
NOTE: The gas supply connection should be according to

applicable ISO 228-1 or ISO 7-1 recommendations. All aspects

of the gas supply connection must comply with current IEC/CEE

requirements and with all applicable local, national, and inter-

national codes.
Check the oven’s gas supply requirements before making the

gas utility connection. Gas supply requirements are listed on

To Gas

Supply Pipe

90°

Elbow

Union OR quick-

disconnect device

Flexible

Gas Hose

Full-Flow

Gas

Shutoff

Valve

90°

Elbow

the oven’s serial plate and in Table 1-5, Gas Orifice and

Pressure Specifications (in Section 1, Description).
Check the serial plate to determine the type of gas to be used

with the oven. Check that the gas type indicated matches the

local supply at the installation. If the gas type on the serial plate

does NOT match the local supply, directions for converting the

oven for use with other gases are described in Part B, Preparation

for Use with Various Gases, in this section.
One 90° elbow equals a 2.13m length of pipe. The recommended

pipe sizes are larger than usually required to eliminate any

operation problems. It is much less expensive to make the

initial installment large enough to do the job rather than redoing

the job later.
Refer to the instructions in the gas hose package (included in

the Installation Kit) before connecting the gas line. One gas line

connection method is shown in Figure 2-15; however,

compliance with the applicable standards and regulations is

mandatory.

Figure 2-15 - Flexible Gas Hose Installation

VII. GAS SUPPLY

CAUTION

DURING PRESSURE TESTING NOTE ONE OF THE FOLLOWING:
1. The oven and its individual shutoff valve must be discon-

nected from the gas supply piping system during any

pressure testing of that system at test pressure in excess

of 3.45 kPa.
2. The oven must be isolated from the gas supply piping

system by closing its individual manual shutoff valve during

any pressure testing of the gas supply piping system at test

pressure equal to or less than 3.45 kPa.

3. If incoming pressure is over 50mbar, a separate regula-

tor MUST be installed in the line BEFORE the individual

shutoff valve for the oven.
WARNING:
To prevent damage to the control valve regula-

tor during initial turn- on of gas, it is very important to open

the manual shutoff valve very slowly.
After the initial gas turn-on, the manual shutoff valve must

remain open except during pressure testing as outlined in

the above steps or when necessary during service main-

tenance.