Link Test

The Link Test is a test for measuring the throughput and efficiency of the RF link between two
Canopy modules.

To perform a link test enter a number into the field labeled “

Duration”. The duration is the number

of seconds the RF link will be tested. Start the link test by clicking the “

Start Test” button. The test

will now run for the set duration. If the web page is not set to automatically refresh, click the
“

Refresh Display” button to see the results. For a Canopy System link to be considered acceptable

it is necessary for the efficiencies of the link test to be greater than 90% in both the uplink and
downlink direction. It is recommended that when a new link is installed that a link test be executed
to ensure that the efficiencies are within recommended guidelines.

The key fields are:

• Downlink RATE, bits per second

• Uplink RATE, bits per second

• Downlink Efficiency, percent

• Uplink Efficiency, percent

Time & Date

This web page is utilized to set the time and date of the access point module when it is not
connected to a Cluster Management Module (CMM). The time and date would need to be set
every time there is a power cycle. The format for the entry is:

Time:

hh:mm:ss Date: mm/dd/yyyy

• hh: two digit hour in military time

• mm: two digit minute

• ss: two digit second

• mm: two digit month

• dd: two digit day

• yyyy: four digit year

Enter in the appropriate information and click the

Set Time and Date button.