MartinLogan E2 User Manual

Page 9

Advertising
background image

Assembly 9

12 Install woofer wiring harness as shown. You can move the

tower to the preferred listening position by shifting

the unit from side to side and “walking” it.

13 When you are confident the sub tower is correctly

positioned, mark the floor with masking tape at each

corner. Install the spikes by using a safe dolly to tip the

sub tower back, remove the glides, and then screw the

spikes into place. Make sure you thread the large

black rubber washer onto the spike post before

installing in the tower. Place the tower in a vertical

position, and level front to back by tilting the tower

back (at least 3 people are required) and adjusting the

spikes.

Figure 13

Figure 14

Advertising