Setting the fpc hdd bat – Matsushita CF-30 User Manual

Page 44

Advertising
background image

9-22

9.2.12. Setting the FPC HDD BAT

1. Fix the FPC HDD BAT using the Screw. <N16>
2. Connect the 2 Cables to the 2 Connectors. (CN7,CN8)
3. Connect the Cable to the Connector. (CN800)
4. Attach the PAD Protect Sheet.
5. Connect the Cable to the Connector. (CN9)
6. Attach the Tape.
7. Connect the 2 Cables to the 2 Connectors. (CN10,CN26)
8. Attach the Tape.
9. Attach the Antenna Cable Sheet on the Main PCB.

10. Fix the HDD FPC BAT using the 5 Screws. <N4> No1 to

No5

Note:

Tighten the Screws in the numbered order (No1 to No5).

Screw <N4>: DRQT26+D3FKL
Screw <N16>: DRQT26+E5FKL

Q

Preparation of HDD FPC ASSY

<N4>

<N16>

<N4>

<N4>

Connector(CN10)

Connector(CN26)

HDD Cable Cover

FPC HDD BAT

Antenna Cable Sheet

to Connector (CN800)

Connector (CN800)

to Connector (CN26)

Tape

Connector(CN9)

Pad PCB

Tape

to Connector (CN8)
to Connector (CN7)

Connector

(CN8)

Pad Protect

Sheet

Connector

(CN7)

No.3

<N4>

No.2

<N4>

No.4

No.1

No.5

Not to forget folding

Tighten of
Screw

Tighten of
Screw

Battery Connector PIN
Cushion is set

Battery Connector
PIN is set

Battery Guide
is set

Order of fixing
Screw

Screw

Fold mountain based
on the white line.

Not to forget folding

Advertising