Catalyst 4500 Series Switches Installation Guide

78-14409-08

Chapter 2 Preparing for Installation

Site-Planning Checklist

3

Power evaluation:

Input power type

Receptacle proximity to the equipment

Dedicated (separate) circuits for redundant
power supplies

UPS for power failures

4

Grounding evaluation:

Circuit breaker size

5

Cable and interface equipment evaluation:

Cable type

Connector type

Cable distance limitations

Interface equipment (transceivers)

6

EMI evaluation:

Distance limitations for signaling

Site wiring

RFI levels

Table 2-2

Site-Planning Checklist (continued)

Task No.

Planning Activity

Verified by

Time

Date