Diagram 8 – Impex MP-3105 User Manual

Page 20

Advertising
background image


STEP 8 (See Diagram 8)

A.) Note: Help of another person is strongly recommended for this step. Place the Weight

Lifting Sleeve (#6) in between the two Safety Stop Frames (#7 & #8). Align the holes
and insert the Weight Bar (#9) into the Left Safety Stop Frame through the Weight
Lifting Sleeve to the other end of Right Safety Stop Frame. Turn the safety hooks on
the Weight Lifting Sleeve to secure its position on the selected slot of the Vertical
Beams (#1 & #2). Center the Weight Bar and secure it to the Left & Right Safety Stop
Frames with two M8 x 3/8” Allen Bolts (#90) on each end.

B.) Slide two Olympic Sleeves (#50) onto the Sliding Weight Post (#22). Slide two Long

Olympic Sleeves (#51) onto the Weight Bar (#9).

C.) Attach four Spring Clips (#49) to the Olympic Sleeves.
D.) Attach the Left & Right Bar Holders (#32 & #33), Left & Right Safety Catches (#30 &

#31) onto the selected peg on the Left & Right Vertical Beams.

DIAGRAM 8


19


Advertising