21 icos, Inst alla tion – IDEAL INDUSTRIES ICOS HE18 User Manual

Page 21

Advertising
background image

21

icos -

Installation & Servicing

INSTALLATION

25 CONDENSATE PIPE TERMINATION CONFIGURATIONS . . . continued

cla9253

BOILER

Air Break

3. INTERNAL CONNECTION TO SOIL AND VENT STACK

* Make connection to SVP using a solvent welded saddle

BOILER

External

wall

Ground Level

Termination

to Soak away

cla7774

minimum

500mm

BOILER

External

wall

Ground Level

Open end of pipe
direct into gulley
below grating but
above water level

DRAIN

cla7775

4. TERMINATION TO SOAK AWAY

5. TERMINATION TO DRAIN / GULLEY

Termination into a down pipe can take place providing it can be confirmed that
the down pipe is part of a combined waste and rain water system.

INST

ALLA

TION

Advertising
This manual is related to the following products: