Smith machine assembly instruction – Impex SM-6001 User Manual

Page 8

Advertising
background image

SMITH MACHINE ASSEMBLY INSTRUCTION

Tools Required Assembling the Machine: Two Adjustable Wrenches and Allen
Wrenches.
NOTE: It is strongly recommended two or more people assembling this machine to
avoid possible injury.

STEP 1 (See Diagram 1)

A.) Do not tighten all nuts and bolts until instructed to do so.
B.) Attach one Base Frame (#1) to the Left Vertical Frame (#3). Attach the Cross Brace (#6)

to the back of the Left Vertical Frame. Align the holes and secure the Base Frame, Left
Vertical Frame, and the Cross Brace together with two M10 x 2 3/8” Carriage Bolts (#83),
Ø ¾” Washers (#89), and M10 Aircraft Nuts (#90). Repeat the same procedure to install
the other side.

C.) Attach a Guide Rod (#12) onto the Base Frame (#1). Secure it to the Base Frame with

one M10 x 1” Allen Bolt (#77) and Ø ¾” Washer (#89) from the bottom.

D.) Slide one Lower Safety Stop Frame (#17) onto the Guide Rod from the top then slide one

Safety Stop Frame (#16) onto the Guide Rod.

E.) Attach a Front Vertical Frame (#2) onto the Base Frame (#1). Secure it with two M10 x 2

3/8” Carriage Bolts (#83), one 6” x 2 ¾” Bracket (#33), two Ø ¾” Washers (#89), and two
M10 Aircraft Nuts (#90).

F.) Attach a Safety Hook (#18) to the Lower Safety Stop Frame (#17). Securely it with one

M10 x 1” Allen Bolt (#77), two Ø ¾” Washers (#89), and one M10 Aircraft Nut (#90).
Attach the Safety Hook onto the selected slot on the back of the Front Vertical Frame.

G.) Repeat Procedure C through F above to install the other side.
H.) Place the Front Top Beam (#5) onto the two Front Vertical Frames (#2).
I.) Insert the top of the Guide Rods (#12) into the holes on the Front Top Beam. Secure

each Guide Rod to the Front Top Beam with one M10 x 1” Allen Bolt (#77) and Ø ¾”
Washer (#89).

J.) Secure each Front Vertical Frame (#2) to the Front Top Beam (#5) with two M10 x 2 3/8”

Carriage Bolts (#83), one 6” x 2 ¾” Bracket (#33), two Ø ¾” Washers (#89), and two M10
Aircraft Nuts (#90).

K.) Secure the Front Top Beam to the Left Vertical Frame (#3) with four M10 x 4” Carriage

Bolts (#85), two Triangle Brackets (#20), four Ø ¾” Washers (#89), and four M10 Aircraft
Nuts (#90). Repeat the same procedure to secure the other side.










7

Advertising