0 test procedures, 0 field updating, 0 publications update – IBM PN 26L0451 User Manual

Page 8: 0 parts disposition, 3 log off the moss-e, 4 returning the machine to the customer

Advertising
background image

Installation Instructions

10.3 Log Off the MOSS-E

1. On the 3746-9x0 Menu window, click on Function, then click on Exit.

2. On the MOSS-E View window, click on Program.

3. Click on LOG OFF MOSS-E.

4. Close the front and rear doors of the controller expansion.

10.4 Returning the Machine to the Customer

Inform the customer that the NNP backup is installed and operational.

11.0 Test Procedures

No test required.

12.0 Field Updating

None.

After Installation (Steps 13-15)

13.0 Field Updating

None.

14.0 Publications Update

None.

15.0 Parts Disposition

3746

PN 42L2445

EC F52322

EC F12701A

EC F70078

FFBM

8 of 10

09 Oct 1998

14 DEC 1998

22 APR 1999

8

Advertising