Cabling your pdus – IBM PC Server/Enterprise Racks 42S User Manual

Page 181

Advertising
background image

NetBAY Power Distribution Units

173

Figure 83. Installing the Rack PDUs and the blank filler panel

6.

Install the 1U blank filler panel

c1d on the front of the rack cabinet at the same U

level as the Rack PDU. Use two M6 screws that come with this option.

Cabling your PDUs

Cable routing differs between horizontal and vertical Rack PDU installations. Refer to
“Cabling instructions for vertical-mount PDUs” on page 175 or “Cabling instructions
for horizontal-mount PDUs” on page 176 as appr
opriate for your installation.

Advertising