0 test procedures, 0 field updating, 0 publications update – IBM PN 10K8798 User Manual
Page 8: 0 parts disposition, 3 logging off the moss-e, 4 returning the machine to the customer
Advertising

Installation Instructions
10.3 Logging Off the MOSS-E
1. On the 3746-9x0 Menu window, click on Function, then click on Exit.
2. On the MOSS-E View window, click on Program.
3. Click on LOG OFF MOSS-E.
4. Close the front and rear doors of the controller expansion.
10.4 Returning the Machine to the Customer
Inform the customer that the NNP backup is installed and operational.
11.0 Test Procedures
No test required.
12.0 Field Updating
None.
After Installation (Steps 13-15)
13.0 Field Updating
None.
14.0 Publications Update
None.
15.0 Parts Disposition
3746
PN 42L2445
EC F52322
EC F12701A
EC F70078
EC F70110
EC H10024
FFBM
8 of 10
09 Oct 1998
14 DEC 1998
22 APR 1999
20 JAN 2000
08 MAR 2001
8
Advertising