Impex AX-PWR7 User Manual

Page 16

Advertising
background image


STEP 10 (See Diagram10 & Cable Loop Diagram)

A.) Attach the 268” Lower Cable (#69) to the Sliding Pulley Bracket (#57). Attach two

Small Pulleys (#71) to the Brackets. Secure them with two M10 x 1 ¾” Allen Bolts
(#86), four

¾” Washers (#42), and two M10 Aircraft Nuts (#44).

B.) Draw the Cable upward to the opening on top of the Front Vertical Frame (#54).

Attach a Pulley (#70) to the opening. Secure it with one M10 x 2 ½” Allen Bolt (#85),
two 5/8” Pulley Bushings (#79), and one M10 Aircraft Nut (#44).

C.) Draw the Cable over the Pulley and down to the open bracket on the Front Vertical

Frame (#52). Install a Pulley with one M10 x 2 ¾” Allen Bolt (#84), two

3/4” Washers

(#42), and M10 Aircraft Nut (#44). Push the Pulley to the left side and do not tighten
the nut and bolt yet.

D.) Pull the Cable around the Pulley then up to the Double Floating Pulley Bracket (#62)

previously installed in Step 9.

E.) Attach a Pulley to a selected hole on the Bracket. Secure it with one M10 x 1 ¾” Allen

Bolt (#86), two

¾” Washers (#42), and one M10 Aircraft Nut (#44). After

completing the cable installation, check the tightness of the cables. If the cable is too
loose, move up the pulley. If the cable is too tight, move down the pulley.

F.) Draw the Cable around the Pulley then down to the bracket on the Front Vertical

Frame. Attach another Pulley to the right of the Pulley previously installed in Step C.
Secure the two Pulleys together with the same nut and bolt previously installed.

G.) Draw the Cable around the Pulley then up and clip to the back of Sliding Pulley

Bracket (#57).

H.) Connect the Shiver Bar (#67) or the Single Handle (#94) to the Cable by a Hook (#90)

for various exercises.


















15



Advertising