Jumpking OR1213 User Manual

Page 16

Advertising
background image

16

Frame

Holes

V-rings

8

10

10

10

10

Springs (10)

22

Hook the V-ring

V-ring

8

10

10

Frame

Black webbing with yellow line

No yellow line

3. Lay the Bed (8) on the ground inside of the

assembled frame. Make sure that the two warn-

ing decals (not shown) are on top of the Bed.

Note: There are V-rings around the edge of the

Bed (8) and holes around the top of the frame.

During this step, you will attach the Bed to the

frame using the included Springs (10) for holes

on top of frame and for holes on bottom of frame

(see the inset drawing). Hook a spring to the

Bed(8) and using the spring pulling tool(22), pull

the spring from the Bed to the hole slot in the

trampoline frame with even spring tension.

Be careful where you place your hands, the

Springs and frame joints can pinch.

To attach each Spring, you will first hook one end

of the Spring into a V-ring with black webbing

with yelow line location (see the inset drawing).

Hook the first two Spring(10) into two the V-rings

(black webbing with yellow line) on the Bed(8) and

into the holes on the top tube. Attach two more

Springs (10) with black with yellow line location

directly across the Bed (with the webbing) from the

first two Spring. Attach two more Spring(10) with

black webbing with yellow line location halfway

between the first/second Spring(10), so eight

Springs(10) are attached as shown. Attach four

more Springs(10) (not shown) halfway between

the first eight Springs(10). Continue attaching

Springs(10) halfway between the previously attached

Springs,until all the Springs are attached.

During the installations of spring, wear

gloves and protective eye wear.

Advertising