Center Panel Installation

(cont.)

Connect the ends of the flexible supply lines with adaptors to the hot and cold connections of the mixer.

The steam lines are to be routed in such a way that they travel up from the steam generators and down to the steam
heads. Using cable ties, tie up the steam lines so there are no kinks or low spots that may trap water. (Do NOT operate
the steam generators without the water supply ON as permanent damage to the generators will occur.)
Connect the steam lines to the generators using hose clamps.

For units with TV, insert audio cables, cable TV lead, fan and TV power cords through the hole in drip shield.

Plug the power cord into the 230 VAC outlet installed previously as shown in the rough-in section.

DANGER: RISK OF ELECTRIC SHOCK. Connect only to a circuit protected by a Ground Fault Circuit
Interrupter.

Reinstall hand held shower holder if removed. Apply sealant to mounting holes if holder was removed completely.

12

POWER SUPPLY CORD

3/8" COPPER TUBING
FROM 3/8" SUPPLY FITTING

HOT WATER

SUPPLY HOSE

COLD WATER

SUPPLY HOSE

CABLE TIES

230V OUTLET

FROM STEAM

FITTINGS ON BATH

DRIP SHIELD

(MODELS WITH

TV ONLY)

CABLE TV

FAN POWER CORD,
CABLE TV LEAD
AND AUDIO CABLES

POWER CORD FOR TV

(UNIT WITH TV SHOWN)

MIXER