Building in – John Lewis JLBICH602 User Manual

Page 6

Advertising
background image

6

Building In

1

The hob must be installed according to the in-
structions supplied by qualified and compe-
tent personnel to the relevant National
Standards.

Building In

• The dimensions of the cut-out section and recess re-

quired must be as shown in the relevant diagrams.

• Proper arrangements must be made of a continuous supply

of air to the hob to prevent overheating.

• Clean the worktop in the area of the cut-out section.
• Stick the one-sided self-adhesive sealing tape supplied all

the way round the lower edge of the cooking surface
along the outer edge of the glass ceramic panel. Do not
stretch it. The cut ends should lie in the middle of one
side. When you have cut it to length (add a few mm),
press the two ends flush up against one another.

• A protective floor must be installed under the appliance.

Advertising