Jacuzzi Summer Rain 2 Wall and 3 Wall User Manual

Page 11

Advertising
background image

STEP 5
Place the tower onto base. Ensure the curved glass
locates into the glazing channel. Install bolt but do not
tighten.

STEP 6
Insert tower support rail into glass panel rail but do not
tighten at this time.

9

STEP 4
Slide the glass panel into the wall post. Make sure that
the corner notch is positioned toward the base of the
tower.

2 WALL: TOWER, FIXED WALL AND CURVED GLASS INSTALLATION

NOTCH

WASHER

BOLT (5/16")

GLAZING
CHANNEL

GLASS PANEL
SUPPORT RAIL

TOWER SUPPORT RAIL

STEP 7
Insert support rails into brackets in top moulding of tower
but do not tighten at this time. Front and tower support
rails may have to be cut if they are too long.

RAIL WALL

MOUNTING BRACKET

MOUNTING

BRACKET

COVER

RAIL

STEP 8
Slide mounting bracket covers and mounting brackets
onto front rail and tower support rail.

TOWER SUPPORT RAIL

FRONT RAIL

GLASS PANEL
SUPPORT RAIL

Advertising