Assembly, Bagger adjustment (see fig. 6 & 7), Horizontal adjustment – Jonsered LT2220 CMA2 User Manual

Page 8: Vertical adjustment

Advertising
background image

8

Fig. 4D

NOTE: The strap hook must go through the discharge chute

only. Do not allow the hook to enter the slot in the tractor

back plate. This will allow the dis charge chute to float with the

mower deck when moving on uneven terrain.

02306

HOOK

BACKPLATE

SLOT

DIS CHARGE

CHUTE

Fig. 5A

TO ASSEMBLE BAGGER (See Figs. 5A-5C)

• Unfold bag by pivoting front bagger tube all the way

forward and pressing the bottom vinyl binding onto the

tube.

Inside the bag, install spreader bars and retainer springs

onto pins on both sides of bag as shown.

Press the vinyl bindings onto the sides of front bagger

tube.

• Slide the bagger dump handle through the hole in the

bagger top, install the clevis pin 10 x 44mm and secure

with retainer spring.

• Push cap over end of bagger dump handle.
NOTE: For future use, the clevis pin may be removed in order

to use the handle to clear the chute in the event it has become

clogged.

Fig. 5C

ASSEMBLY

BAGGER ADJUSTMENT (See Fig. 6 & 7)

For proper bag function and appearance, it may be nec-

es sary to adjust the bagger assembly. There should be 6mm

(1/4")-9mm (3/8") gap between the bagger top and fender

and the bagger top surface should be even with the top

surface of the fender. To adjust bagger position:

Fig. 6

HORIZONTAL ADJUSTMENT

• Slightly loosen the nuts securing the bagger RH and

LH hor i zon tal adjustment brackets. Loosen only enough

so the brackets keep their position, but allow them to

be moved.

Move the brackets the amount forward or back ward you

wish the bag assembly to move. Retighten the nuts

securely.

VERTICAL ADJUSTMENT

• Slightly loosen the nuts securing the vertical adjust-

ment brackets. Loosen only enough so the brackets

keep their position, but allow them to be moved.

Move the brackets the amount up or down you wish the

bag assembly to move. Retighten the nuts securely.

• Reinstall the bagger as sem bly and check the bagger

to fender fit. If necessary, repeat the procedure until

proper fit is attained.

02

90

5

VINYL BINDING

FRONT BAGGER TUBE

02

906

RETAINER SPRING

SPREADER BARS

RETAINER

SPRING

VINYL

BINDING

Fig. 5B

02

907

DUMP HANDLE

TUBE

CLEVIS PIN 10 X 44MM

RETAINER SPRING

CAP

Fig. 7

02967

TOP SURFACES

EVEN

6MM (1/4") - 9MM (3/8")

HORIZONTAL

ADJUSTMENT

BRACK ET

VERTICAL

ADJUSTMENT

BRACK ET

BAGGER

LATCH

Advertising