Sears 200.71991 User Manual

Page 16

Advertising
background image

•

13

•

The hydrometer or Electronic Method

13.2

To find the time needed to fully charge your battery, determine the bat-

tery’s charge level with a hydrometer or electronic Percent-of-Charge

Tester. The following table will help you convert hydrometer readings to

percent of charge values.

SPECIfIC GRAvITY

PERCENT Of ChARGE PERCENT Of ChARGE

NEEdEd

1.265

100%

0%

1.225

75%

25%

1.155

25%

75%

1.120

0%

100%

When you know the percent of charge and the Amp Hour (AH) rating of

your battery, you can calculate the approximate time needed to bring your

battery to a full charge.
To

convert Reserve Capacity to Amp Hours, divide Reserve Capacity by

2, and add 16:

Amp Hours = Reserve Capacity + 16

2

NOTE: The Reserve Capacity can be obtained from the battery specifica-

tion sheet or the owner’s manual.
To calculate time needed for a charge:

Find the percent charge needed. (A battery at 50 percent charge that will

•

be charged to 100 percent needs another 50 percent (.50)).
Multiply the Amp Hour rating by the charge needed (.50) and divide by

•

the charger setting (2, 15, or 60 amps).
Multiply the results by 1.25 and you will have the total time needed, in

•

hours, to bring the battery to full charge.
Add one additional hour for a deep-cycle battery.

•

Example:
Amp Hour Rating x charge needed x

1.25

= hours of

Charger Setting

charge

100 (AH Rating) x .50 (charge needed) x 1.25

= 3.125

20 (Charger Setting)

hours

100 x .50 2.5 x 1.25 = 3.125

20

You would need to charge your 100-Ampere Hour Battery for a little more

than 3 hours at the 20-Amp charge rate using the above example.

Advertising