Installing the switch, Equipment checklist, Selecting a site – SMC Networks 24/16 User Manual
Page 18: Equipment checklist selecting a site, Nstalling, Witch

I
NSTALLING
THE
S
WITCH
7
I
NSTALLING
THE
S
WITCH
The EZ Switch 10/100 can be placed on a desktop or shelf, or
installed in a standard 19-inch equipment rack.
Equipment Checklist
After unpacking the EZ Switch 10/100, check the contents of the
box to be sure you have received the following components:
•
EZ Switch 10/100 SMC-EZ1024FDT or SMC-EZ1016FDT
•
Appropriate AC power cable
•
Rackmount kit
•
Four adhesive foot pads
•
SMC Warranty Registration Card
•
This User Guide
Selecting a Site
Be sure to follow the site selection guidelines below when
choosing a location:
Select a suitable location for the switch:
•
It should be accessible for installing, cabling and
maintaining the switch.
•
The temperature and humidity should be within the ranges
listed in the specifications.
•
The status LEDs should be clearly visible.
•
There should be adequate space (approximately two
inches) on all sides for proper air flow.