Swisher ACR-500 User Manual

Page 7

Advertising
background image

STEP 4: ATTACH CABLE PIVOT BAR
Attach the two lift cable pivot bars (K) to the diameter of
19mm x length of 118mm shaft on the tongue assembly.
Install each pivot bar on top of shaft, use a diameter 8mm
Teflon washer (D) between the two bars, then secure with a
M8 nylock nut (M) . The cables and lock pins should be
positioned facing the rear of rake. See figure 4.

STEP 5: ATTACHING LIFT ROD
Attach the diameter 6mm round end of the lift rod(L) to the
diameter 6mm hole on the inside of lifting handle. Secure
with diameter 6mm flat washer(C), then cotter pin. See
figure 5.

STEP 6: ATTACH CLEVIS TO PIVOT BAR - Attach
the clevis pin(I) on the end of lift rod (opposite end of lift
handle). Then attach the clevis to the cable pivot bar from
STEP 4, secure with diameter 6mm x 25mm clevis pin(I)
into diameter 6mm hole. See figure 6.
Do not insert cotter pin until adjustment procedure in
STEPS 11 to 13. Repeat STEPS 5 and 6 for second lifting
rod.

STEP 7: ATTACH LIFT ARMS TO AXLE
Attach the lift arm(#5) to the wheel axle(#1) using M12 x
110mm hex bolt(A) and M12 nylock nut(G). See figure 7.
Repeat on opposite side.
Usage Note: Note the lift arm offset in figure 7.
Assembling lift arms with the offset towards inside will
make a narrower space when raking. Narrow space is
recommended when using Sweeper attachment.

Figure 4

Figure 5

Figure 6

Figure 7

Advertising
This manual is related to the following products: