Troubleshooting, Installation checklist, Sequence of operation – State Industries ULTRA FORCE 101 User Manual

Page 58: Installation checklist sequence of operation, Sequence of

Advertising
background image

58

seQuence of operation

read the Sequence of Operation below before attempting to

correct any operational problems. refer to the Features And

Components section beginning on page 7 for the location

of various water heater components described below. See the

Sequence Of Operation Flow Chart on page 59 also.
1. When the control system is first powered, during boot

up, it will display water heater model information during

initialization. After a few moments the control system LCD

which is part of the Uim (user interface module) will display

the default screen known as the "Desktop" screen.

2. if the control system determines that the actual water

temperature inside the tank is below the programmed

Operating Set Point minus the Differential setting, a heating

cycle is activated.

3. The control system then performs selected diagnostic system

checks. This includes confirming the low gas pressure,

blocked exhaust, blocked intake and ECO (energy cut

out) switch contacts are closed. The blower Prover Switch

contacts are confirmed open.

4. if all diagnostic checks are successfully passed, the control

system energizes the Combustion blower for pre-purge.

5. The control system must confirm the blower Prover Switch

contacts close after the Combustion blower is energized.

6. if the blower Prover Switch contacts are confirmed closed

the control system energizes the Hot Surface igniter for the

igniter warm-up period.

7. The control system monitors the igniter current and must

sense a minimum of 2.0 AC amps during the igniter warm up

period (12-17 seconds).

8. if igniter amperage is confirmed at or above the required

minimum the control system energizes the 24 Volt Gas Valve

allowing gas to flow to the main burner.

9. The control system de-energizes the Hot Surface igniter.
10. The control system monitors the flame sensor to confirm a

flame is present at the main burner. if a flame is not verified

during the ignition trial period the control system will try for

ignition up to two more times. if flame can not be verified after

three trials for ignition, the control system will lock out and

display the “ignition Failure” Fault message.

11. if a flame is verified, the control system will enter the

heating mode where it will continue heating the water until

the Operating Set Point is reached. At this point, the control

system will de-energize the 24 Volt Gas Valve and enter the

post-purge cycle (approximately 30 seconds).

12. The Combustion blower will run for the duration of the post-

purge cycle to purge the water heater of all combustion

gases. When the post-purge cycle is complete, the blower is

de-energized and will coast to a stop.

13. The control system now enters the standby mode while

continuing to monitor the internal storage tank water

temperature and the state of other system devices. if the

tank temperature drops below the Operating Set Point minus

the Differential setting, the control will automatically return to

Step 2 and repeat the operating cycle.

troubleshooting

installation checklist

The list below represents some of the most critical installation

requirements that, when overlooked, often result in operational

problems, down time and needless parts replacement. This

is not a complete list. before performing any troubleshooting

procedures use the list below to check for installation errors.

Costs to correct installation errors are not covered under the

limited warranty. Ensure all installation requirements and

instructions in this manual have been maintained and followed.
water heater location
1. Ensure proper clearances to combustibles are maintained

and there is sufficient room to service the water heater. See

Clearance To Combustible materials on page 13.

2. Ensure the area is free of corrosive elements and flammable

materials. See the instructions on page17.

Venting
3. Ensure the intake air and/or vent (exhaust) piping is the correct

size for the installed length. See Venting requirements on

page 24.

4. Ensure the maximum equivalent feet of pipe has not been

exceeded for the intake air and/or vent pipe. See Table 7 on

page 24.

5. Ensure the maximum number of elbows has not been

exceeded in the intake air and/or vent pipe. See Venting

requirements on page 24.

6. Ensure the intake air screen has been removed from the

intake air connection on the water heater when installing the

water heater in a Direct Vent configuration. See Figure 19

on page 26.

7. Ensure all exterior clearances for the intake air, vent and

concentric terminations are maintained. See Vertical

Termination installation on page 27, Sidewall Termination

installation on page 29 and Concentric Termination installation

on page 30. These clearances and those cited by local and

national codes must be maintained.

gas supply and piping
8. Ensure a supply gas regulator has been installed for each

water heater. See the requirements for a Supply Gas regulator

on page 14 and Supply Gas regulator on page 14.

9. Ensure the supply gas line to each water heater meets

the minimum supply gas line size requirements. See the

requirements for the Gas Supply Systems on page 14 and

the installation instructions on page 39 and 40.

condensate drain
10. Ensure the condensate drain is properly connected to the

exhaust elbow on the water heater and draining freely to a

suitable floor drain. See Figure 9 on page 17 and Condensate

Drain installation on page 38.

electrical connections
11. Ensure the power supply connections to the water heater are

polarity correct. See the requirements for the Power Supply

on page 14 and Electrical Wiring on page 41.

12. Ensure the water heater is properly grounded. Flame sensing

requires an adequate earth ground. if the water heater is not

properly grounded it will cause ignition Failure.