Operation, Opera t ion – Servis-Rhino 2160 User Manual

Page 112

Advertising
background image

OPERATION

2160 02/10

Operation Section 4-14

© 2010 Alamo Group Inc.

OPERA

T

ION

FRAME ASSEMBLY

•

Inspect condition of mounting frame weldment.

•

Inspect condition of King Post frame.

•

Ensure all bolts and screws are in position and
are properly torqued.

•

Ensure all pins are in place and fastened with
screws.

•

Ensure frame is properly mounted to tractor
and hardware is propely installed and
tightened. OPS-B- 0021_E

BOOM ARM ASSEMBLY

•

Inspect condition of each arm section weldment

•

Ensure all pins are in place.

•

Ensure all bolts and screws are properly
installed.

•

Check condition of bushings at boom pivot
points.

•

Ensure each hydraulic cylinder is installed and
retained correctly. Ensure the proper size pins
are used to retain the cylinders in place and are
secured properly. OPS-B- 0022_I

Never attempt to lubricate, adjust, or remove material from the Implement while it is in
motion or while tractor engine is running.

(SG-20)

Advertising